Connecting to a sewer

胡桃大战史莱姆在哪里可众看?-快连加速器app

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

胡桃大战史莱姆在哪里可众看?-快连加速器app

胡桃大战史莱姆在哪里可众看?-快连加速器app

闪电加速器官方下载,sdyun闪电云,闪电云加速,闪电云加速器官方下载  荔枝加速器安卓下载,荔枝加速器用不了了,荔枝加速器不能用了,荔枝加速器vps  iplc专线mac下载,iplc专线npv,iplc专线2024年,iplc专线vpm  p30u加速器官网网址,p30u加速器mac下载,p30u加速器免费永久加速,p30u加速器打不开  快柠檬加速器,快柠檬vp加速器,快柠檬加速器官网,  一元加速器ios下载,一元加速器免费试用,一元加速器不能用了,一元加速器vp  2024免费加速神器,2024永久不收费的加速器,2024最好用的加速器,  快喵加速官网版,暴喵加速器官方网址,快喵加速器旧版,快喵加速器怎么样